In the summer of 2022, STISA completed the installation of a state-of-the-art solar power plant on the company’s first rooftop.
Our commitment to solar energy doesn’t stop here. A feasibility study is currently underway for the second phase of the project, which involves installing additional solar panels to increase the photovoltaic potential by 1,400 KWp. This expansion will utilize the remaining covered surfaces of the company, aiming to boost the production of clean energy.
As part of the third phase of our solar project, STISA plans to cover company parking areas with an additional 1,300 KWp of solar panels. This further expansion will optimize every available space for solar energy production, making STISA increasingly energy-independent and a leader in sustainability.
STISA is building of charging stations for heavy vehicles. It will be in function by the end of 2025, aims to support the transition to a more ecological fleet, enabling trucks to recharge directly at our solar energy hub.
This energy covers over 50% of the company's energy needs, enabling it to significantly reduce its environmental impact and contribute to a sustainable future
System capacity
Annual energy production
Of our company's energy needs
Feasibility study for the second phase